Skip to content
TrinolIT
TrinolIT

A delivery system, not a timeline graphic

Every phase endswith somethingyou can inspect.

The work is divided by risk rather than ceremony. Each phase produces an artifact, has a written exit state, and can stop without making the previous work disappear.

Delivery ledger

Artifact. Exit test. Then the next decision.

  1. 01

    Scope

    Problem boundary and acceptance map

    The important success and failure cases are written in testable language.

  2. 02

    Decide

    Architecture and decision records

    The expensive-to-reverse choices include their cost, alternative and rollback path.

  3. 03

    Build

    Running vertical slice in your repository

    The slice works against real infrastructure and passes its agreed checks.

  4. 04

    Attack it

    Adversarial and acceptance test evidence

    Money, identity, permissions and concurrency survive the cases designed to break them.

  5. 05

    Hand over

    Runbook, deployment and owner walkthrough

    Your team can deploy, operate and change the system without TrinolIT.

How we work

Five steps. One of them is the reason to hire us.

  1. Scope

    We work out what the system has to get right and what it is allowed to get wrong, and write it down before anyone opens an editor.

  2. Decide

    The decisions that are expensive to reverse get recorded with their cost, not just their benefit. A decision record that lists no downside has not been thought through.

  3. Build

    Production code from the first commit: typed, migrated, tested against real infrastructure, in your repository rather than ours.

  4. Attack it

    The isolation, the concurrency and the money paths get an adversarial test suite whose job is to break them. This is the step that separates a system that works from a system that has been shown to work — and it is the one most agencies do not have, which is why they cannot tell you whether their software still holds.

  5. Hand over

    Documentation, decision records, the test suite, the deployment, and a walkthrough with the people who will own it. You should not need us afterwards.

Commercial control

You can stop between phases and keep the work.

Larger builds are priced and billed by phase. Scope, code, decision records, tests and deployment live in your repository. A change to the price or outcome is written down before work continues, not explained on an invoice afterwards.

Put a problem through this process

Start here

You havesomething thathas to be right.

Tell us what it has to get right and what it is allowed to get wrong. If it is not something we should take on, we will say so and point you somewhere better.

Reply time
We reply within one working day.
Or write directly
hello@trinolit.com
Where
Dhaka, Bangladesh